DE | EN
DE | EN

Munich, SAP Garden Multifunctional sports hall_Event building

Project description

Munich, SAP Garden

Multifunctional hall with a spectator capacity of 12,500 seats

Excavation depths of up to 15 m with a groundwater inclusion of up to 9 m

Tight enclosure of the excavation pit with dimensions of 240m x 140m

Temporary groundwater relaxation in the Tertiary

Permanent uplift protection in partial areas using micropiles

Slab foundation with partly high column loads

Extensive measures to maintain groundwater circulation in the strata with varying groundwater levels

Commissioned services

Geotechnical investigation report for the architectural competition

Subsoil investigation

Soil mechanical laboratory tests

Pumping tests in the boreholes developed into GWM

Geotechnical and hydrogeological report

Application for water rights for temporary and permanent interventions in groundwater

Geotechnical and hydrogeological consulting in the course of implementation planning and execution

Supervision/analysis of pile sample loads and tests

Groundwater utilisation to support the cooling of buildings

Client

Red Bull Stadium Munich GmbH

Performance period

since 2017

Contact person

Dipl.-Ing. Michael Kupka, Dr.-Ing. Thomas Rumpelt and Dr. Lisa Krienen

[my_elementor_php_output]