Horb, Neckar bridge B32_08-069

Project description

Horb, Neckar bridge B32

New construction of a 667 m long viaduct in semi-integral construction over the Neckar river

Location of the bridge in the Upper/Middle Muschelkalk (limestone/claystone) with pronounced fissures and crevices on the valley flanks due to leaching and collapse of the Middle Muschelkalk

pillars up to 65 metres high

Pile foundations with bored piles (D = 1.5 m) in the Middle Muschelkalk and after carrying out rock stabilisation, shallow foundations in the Upper Muschelkalk

Extensive earthworks in the area of a former quarry

Commissioned services

Subsoil investigation

Geotechnical reports

Hydrogeological expertise

Tunnelling expertise for laying a pipeline (DN 2000)

Geotechnical consulting

Participation in planning and tendering

Calculation of spring stiffness / pre-dimensioning of shoring / stability calculations

External supervision of the earthworks on the abutment

Client

Karlsruhe Regional Council

Performance period

2008 - today

Contact person

Dr.-Ing. Thomas Rumpelt, Dipl.-Geol. Dr. Martin Brodbeck, Dipl.-Ing. Michael Kupka