DE | EN
DE | EN

Metsovo Bridge, Greece

Project description

Metsovo Bridge, Greece

New construction of a 540 m long prestressed concrete bridge over the 120 m deep Metsovo gorge

Location of the bridge in sandstone, mudstone and limestone

High structural loads from pillars up to 120 m high

High seismic stresses

Pillars are founded on wells with a diameter of 12 metres and a length of up to 25 metres

Commissioned services

Planning and supervising subsoil exploration and laboratory tests

Subsoil and foundation expertise

Foundation optimisation and numerical calculations

Geotechnical advice on site during the execution phase

Client

Leonhardt Andrä and Partner, Consulting Engineers VBI

Performance period

2001 – 2004

Contact person

Dr.-Ing. Thomas Rumpelt

[my_elementor_php_output]