Project description
Munich, SAP Garden
Multifunctional hall with a spectator capacity of 12,500 seats
Excavation depths of up to 15 m with a groundwater inclusion of up to 9 m
Tight enclosure of the excavation pit with dimensions of 240m x 140m
Temporary groundwater relaxation in the Tertiary
Permanent uplift protection in partial areas using micropiles
Slab foundation with partly high column loads
Extensive measures to maintain groundwater circulation in the strata with varying groundwater levels
Commissioned services
Geotechnical investigation report for the architectural competition
Subsoil investigation
Soil mechanical laboratory tests
Pumping tests in the boreholes developed into GWM
Geotechnical and hydrogeological report
Application for water rights for temporary and permanent interventions in groundwater
Geotechnical and hydrogeological consulting in the course of implementation planning and execution
Supervision/analysis of pile sample loads and tests
Groundwater utilisation to support the cooling of buildings
Client
Red Bull Stadium Munich GmbH
Performance period
since 2017
Contact person
Dipl.-Ing. Michael Kupka, Dr.-Ing. Thomas Rumpelt and Dr. Lisa Krienen