Project description
Expansion of the Karl Storz logistics center, Neuhausen ob Eck
take-off GewerbePark, former airport of the Reichs-Luftwaffe during World War II
Subsoil: Filling over weathering cover over White Jurassic (so-called sloping bench limestones)
Logistics centre and production building up to 5 rising storeys
Sprinkler tanks, technical cellar
Conversions in existing buildings and ongoing operations
Excavations in White Jurassic rock to a depth of around 5 metres
High requirements for the floor slab level
Commissioned services
Subsoil investigation
orientating waste analysis
Geotechnical report
Stability analyses of excavation pits directly for existing foundations with high loads
Geotechnical consulting for implementation planning
Specialist site management for earthworks and foundation engineering
Client
Karl Storz SE & Co. KG
Performance period
2021 bis …
Contact person
net EUR 32,000 (as at October 2021)
Dipl.-Ing. Holger Jud