Rio, Brazil - Raw water intake

Project description

Water intake tunnel (Raw Water Intake) Part of the new construction of a steelworks near Rio de Janeiro

Undercutting of the main access road to the construction site using the DN 2200 pipe jacking method (L = 130 m) with little overburden. Subsoil: cohesive alluvial soils with a soft, partly mushy consistency, groundwater level at ground level

Commissioned services

Planning the pipe jacking work with a slurry TBM or with a bonnet shield

Determination of the requirements for the tunnelling system, the jacking pipes and the process engineering installations in the starting and target shafts

Dimensioning of the necessary ground improvement measures

Client

TK-CSA ThyssenKrupp Companhia Siderúrgica, Rio de Janeiro, Brazil

Performance period

since 2007

Contact person

Dipl.-Ing. Holger Jud